Middletown Area Transit (MAT) / BOARDING STOP
Silver & Wall
Clinton
Silver & Wall
Next departures
◷
No upcoming departures
Check the full timetable or choose another date or boarding stop.
Live data unavailableRefreshes every 30 seconds
Routes at this boarding location
Other stops nearby
◎Main St Extension & Mill St↗◎Silver & Elm↗◎Silver St & McKenzie St↗◎Silver & Allison Street↗◎Silver & Walnut Street - Installed↗◎Middletown Post Office↗◎CVS @ East Main Street↗◎CVS @ Main Street Extension↗◎Sanseer Mill↗
Nearby locations are based on coordinates; walking connections have not been verified.
Published Middletown Area Transit (MAT) schedule
Imported Oct 24, 2026 · 04:31 UTC · Service dates 2026-05-27 through 2027-05-27. See data status
Schedule data published by Middletown Area Transit (MAT). Feed discovery and cached source archives from MobilityData. Source details ↗