MBTA / BOARDING STOP
Cambridge Rd @ Rehabilitation Way
Stop code 1677 · MBTA network
Cambridge Rd @ Rehabilitation Way
Next departures
350
North Burlington via Mall RdLive · estimated time
43 min10:09 AM · Tue, Oct 27 · scheduled 10:06 AM
Live predictions availableRefreshes every 30 seconds
Routes at this boarding location
Other stops nearby
Nearby locations are based on coordinates; walking connections have not been verified.
Published MBTA schedule
Imported Oct 23, 2026 · 19:06 UTC · Service dates 2026-10-14 through 2026-12-12. See data status
Schedule and realtime data provided by MassDOT / MBTA. Source details ↗