Nevada County Connects (Gold Country Stage) / BOARDING STOP
Whispering Pines Ln across from 1415 building at Brunswick Rd
Nevada County Connects (Gold Country Stage) network
Whispering Pines Ln across from 1415 building at Brunswick Rd
Next departures
◷
No upcoming departures
Check the full timetable or choose another date or boarding stop.
Live data unavailableRefreshes every 30 seconds
Routes at this boarding location
Other stops nearby
◎Whispering Pines Ln across from Miners Family Health Ctr↗◎Whispering Pines Ln at Miners Family Health Ctr↗◎Whispering Pines Ln at 1415 building at Brunswick Rd↗◎Crown Point Cir across from 333 building↗◎Crown Point Cir at Crown Point Ct↗
Nearby locations are based on coordinates; walking connections have not been verified.
Published Nevada County Connects (Gold Country Stage) schedule
Imported Oct 24, 2026 · 05:45 UTC · Service dates 2026-09-08 through 2027-06-30. See data status
Schedule data published by Nevada County Connects (Gold Country Stage). Feed discovery and cached source archives from MobilityData. Source URL cross-reference: Transitland Atlas (CC BY 4.0). Source details ↗ · Transitland Atlas source discovery (CC BY 4.0)