◎

Nevada County Connects (Gold Country Stage) / BOARDING STOP

Rough and Ready Hwy across from Ironclad Rd

Nevada County Connects (Gold Country Stage) network

Rough and Ready Hwy across from Ironclad Rd

Next departures

America/Los_Angeles
6
Penn ValleyScheduled · estimated time
54 min10:12 AM · Sat, Oct 31
6
Penn ValleyScheduled · estimated time
12:12 PM12:12 PM · Sat, Oct 31
6
Penn ValleyScheduled · estimated time
2:12 PM2:12 PM · Sat, Oct 31
6
Penn ValleyScheduled · estimated time
4:12 PM4:12 PM · Sat, Oct 31
Live data unavailableRefreshes every 30 seconds

Routes at this boarding location

Other stops nearby

Nearby locations are based on coordinates; walking connections have not been verified.

✓
Published Nevada County Connects (Gold Country Stage) schedule

Imported Oct 24, 2026 · 05:45 UTC · Service dates 2026-09-08 through 2027-06-30. See data status

Schedule data published by Nevada County Connects (Gold Country Stage). Feed discovery and cached source archives from MobilityData. Source URL cross-reference: Transitland Atlas (CC BY 4.0). Source details ↗ · Transitland Atlas source discovery (CC BY 4.0)