Los Angeles County / Rail
Metrolink RIV Line schedule and full timetable
Metrolink Riverside Line · America/Los_Angeles
Selected branch: Riverside - Downtown · 7 stops. Service day: Saturday, June 19, 2027.
Metrolink RIV Line full stop-by-trip timetable
All stops on the selected branch, June 19, 2027. 0 fixed scheduled trips; showing 0–0. Frequency service is listed in the boarding schedule below. A dash means the agency supplies no time.
| Stop / trip |
|---|
| L.A. Union Station |
| Montebello / Commerce |
| Industry |
| Pomona - Downtown |
| Ontario - East |
| Jurupa Valley / Pedley |
| Riverside - Downtown |
No fixed scheduled trips on this branch for this date. Check the boarding schedule for frequency windows or choose a different service day.
Every departure from L.A. Union Station
For the selected service day and branch. After-midnight times retain their service-day association; “+1 day” means the following calendar day.
| Departure / window | Destination | Boarding notes |
|---|---|---|
| No published boarding times for this stop, branch and date. | ||
More Metrolink travel information
Imported Oct 24, 2026 · 04:29 UTC · Service dates 2026-05-05 through 2027-12-31. See data status
Schedule data published by Metrolink. Feed discovery and cached source archives from MobilityData. Source details ↗