◎

Merrimack Valley Regional Transit Authority (MVRTA) / BOARDING STOP

100 River Street

Merrimack Valley Regional Transit Authority (MVRTA) network

100 River Street

Next departures

America/New_York
1
HAVERHILL via THE LOOPScheduled · estimated time
19 min12:04 PM · Wed, Nov 18
1
HAVERHILL via THE LOOPScheduled · estimated time
39 min12:24 PM · Wed, Nov 18
1
HAVERHILL via THE LOOPScheduled · estimated time
59 min12:44 PM · Wed, Nov 18
1
HAVERHILL via THE LOOPScheduled · estimated time
1:04 PM1:04 PM · Wed, Nov 18
1
HAVERHILL via THE LOOPScheduled · estimated time
1:24 PM1:24 PM · Wed, Nov 18
1
HAVERHILL via THE LOOPScheduled · estimated time
1:44 PM1:44 PM · Wed, Nov 18
1
HAVERHILL via THE LOOPScheduled · estimated time
2:04 PM2:04 PM · Wed, Nov 18
1
HAVERHILL via THE LOOPScheduled · estimated time
2:24 PM2:24 PM · Wed, Nov 18
1
HAVERHILL via THE LOOPScheduled · estimated time
2:44 PM2:44 PM · Wed, Nov 18
1
HAVERHILL via THE LOOPScheduled · estimated time
3:04 PM3:04 PM · Wed, Nov 18
1
HAVERHILL via THE LOOPScheduled · estimated time
3:24 PM3:24 PM · Wed, Nov 18
1
HAVERHILL via THE LOOPScheduled · estimated time
3:44 PM3:44 PM · Wed, Nov 18
Live data unavailableRefreshes every 30 seconds

Routes at this boarding location

Other stops nearby

Nearby locations are based on coordinates; walking connections have not been verified.

✓
Published Merrimack Valley Regional Transit Authority (MVRTA) schedule

Imported Oct 24, 2026 · 04:30 UTC · Service dates 2026-09-07 through 2099-12-31. See data status

Schedule data published by Merrimack Valley Regional Transit Authority (MVRTA). Feed discovery and cached source archives from MobilityData. Source details ↗