◎

Merrimack Valley Regional Transit Authority (MVRTA) / BOARDING STOP

Jackson and John Street

Merrimack Valley Regional Transit Authority (MVRTA) network

Jackson and John Street

Next departures

America/New_York
1
HAVERHILL via THE LOOPScheduled · estimated time
14 min12:18 PM · Wed, Nov 18
1
HAVERHILL via THE LOOPScheduled · estimated time
34 min12:38 PM · Wed, Nov 18
1
HAVERHILL via THE LOOPScheduled · estimated time
54 min12:58 PM · Wed, Nov 18
1
HAVERHILL via THE LOOPScheduled · estimated time
1:18 PM1:18 PM · Wed, Nov 18
1
HAVERHILL via THE LOOPScheduled · estimated time
1:38 PM1:38 PM · Wed, Nov 18
1
HAVERHILL via THE LOOPScheduled · estimated time
1:58 PM1:58 PM · Wed, Nov 18
1
HAVERHILL via THE LOOPScheduled · estimated time
2:18 PM2:18 PM · Wed, Nov 18
1
HAVERHILL via THE LOOPScheduled · estimated time
2:38 PM2:38 PM · Wed, Nov 18
1
HAVERHILL via THE LOOPScheduled · estimated time
2:58 PM2:58 PM · Wed, Nov 18
1
HAVERHILL via THE LOOPScheduled · estimated time
3:18 PM3:18 PM · Wed, Nov 18
1
HAVERHILL via THE LOOPScheduled · estimated time
3:38 PM3:38 PM · Wed, Nov 18
1
HAVERHILL via THE LOOPScheduled · estimated time
3:58 PM3:58 PM · Wed, Nov 18
Live data unavailableRefreshes every 30 seconds

Routes at this boarding location

Other stops nearby

Nearby locations are based on coordinates; walking connections have not been verified.

✓
Published Merrimack Valley Regional Transit Authority (MVRTA) schedule

Imported Oct 24, 2026 · 04:30 UTC · Service dates 2026-09-07 through 2099-12-31. See data status

Schedule data published by Merrimack Valley Regional Transit Authority (MVRTA). Feed discovery and cached source archives from MobilityData. Source details ↗