350

Boston / Bus

MBTA 350 first and last departure times

North Burlington - Alewife Station · America/New_York

Selected branch: North Burlington via Mall Rd · 67 stops. Service day: Wednesday, October 28, 2026.

This date is outside the agency’s published schedule coverage. Choose a covered date; missing future data does not mean service is canceled.

First and last published boarding times

Wednesday, October 28, 2026 · North Burlington via Mall Rd. These are supplied times for this branch. Stops or trips with omitted times cannot establish complete first/last bounds. Drop-off-only visits are excluded. A frequency window’s end is labeled separately and is not an exact last departure.

Boarding stopFirst departureLast departure / window endService notes
No boarding service for this branch and date.

Times after midnight belong to the service date above. These route limits do not establish the last viable connecting journey. Check connection times separately, or use a reviewed airport guide for a direct airport journey.

First and last times on other branches

All other published stopping patterns for the same service date. Open a branch to compare its stop-by-stop boarding limits.

Alewife via Mall Rd · 62 stops · Pattern 54138931f3646b1ad85a64c4

No boarding service on this branch for 2026-10-28.

Third Ave · 46 stops · Pattern 9c89bb7ed869c7011d8fe805

No boarding service on this branch for 2026-10-28.

More MBTA travel information

✓
Published MBTA schedule

Imported Nov 27, 2026 · 06:30 UTC · Service dates 2026-11-18 through 2026-12-12. See data status

Schedule and realtime data provided by MassDOT / MBTA. Source details ↗