Bronx County / MTA Metro-North Railroad

MTA Metro-North Railroad transit transfers and connections

Published transfer points and station connections, with agency fare-rule references.

Published connection points

These pairs come from the agency’s transfer records. A published connection does not guarantee that any two departures connect. A minimum transfer time, when supplied, is a planning allowance rather than a measured walking time.

Fare transfer rules are separate from physical connections. Read MTA Metro-North Railroad fare-transfer policy ↗ · Fares and payment guide ↗

The current feed does not publish general transfer pairs between served stops. Check station pages for platforms and the agency’s instructions for connections.
Find boarding stops and serving routes →
✓
Published MTA Metro-North Railroad schedule

Imported Oct 31, 2026 · 06:54 UTC · Service dates 2026-10-05 through 2027-03-28. See data status

Schedule data published by MTA Metro-North Railroad. Feed discovery and cached source archives from MobilityData. Source details ↗