Port Authority of Allegheny County / BOARDING STOP
Merrick Ave + Hobson
Stop code 6170 · Port Authority of Allegheny County network
△ Closure: Mt Washington Tunnel
Multiple 11/2-11/7 Closure: Mt Washington Tunnel https://rideprt.org/detours
△ Mt Lebanon Station Elevator O/S
The Mt Lebanon Station elevator is out of service.
Merrick Ave + Hobson
Next departures
Live predictions availableRefreshes every 30 seconds
Routes at this boarding location
Other stops nearby
◎EBEN ST + SHIRE PL↗◎CHELTON AVE + FREEDOM↗◎SHIRE PL + BREINING ST↗◎FREEDOM AVE + CREEDMORE FS↗◎FREEDOM AVE + WAREMAN↗◎FREEDOM AVE + MERRICK↗◎BREINING ST + BROOKLINE BLVD↗◎BROOKLINE BLVD AT BELLAIRE PL↗◎BROOKLINE BLVD + BREINING↗◎BROOKLINE BLVD + BIRCHLAND↗◎BROOKLINE BLVD + #1439↗◎BROOKLINE BLVD + #1439↗
Nearby locations are based on coordinates; walking connections have not been verified.
Published Port Authority of Allegheny County schedule
Imported Oct 30, 2026 · 09:54 UTC · Service dates 2026-10-18 through 2027-02-20. See data status
Schedule data published by Port Authority of Allegheny County. Feed discovery and cached source archives from MobilityData. Source details ↗