◎

Port Authority of Allegheny County / BOARDING STOP

Fifth Ave + Craig

Stop code 1170 · Port Authority of Allegheny County network

△ Gateway Escalator O/S

The escalator at Gateway is O/S. We apologize for the inconvenience.

△ Mt Lebanon Station Elevator O/S

The Mt Lebanon Station elevator is out of service.

Fifth Ave + Craig

Next departures

America/New_York
P3
INBOUND-OAKLANDScheduled
2 min5:55 AM · Fri, Nov 27
71D
INBOUND-OAKLANDScheduled
12 min6:05 AM · Fri, Nov 27
71B
INBOUND-DOWNTOWNScheduled
17 min6:10 AM · Fri, Nov 27
75
INBOUND-SOUTH SIDE WORKSScheduled
23 min6:16 AM · Fri, Nov 27
P3
INBOUND-OAKLANDScheduled
26 min6:19 AM · Fri, Nov 27
P3
INBOUND-OAKLANDScheduled
41 min6:34 AM · Fri, Nov 27
71D
INBOUND-OAKLANDScheduled
42 min6:35 AM · Fri, Nov 27
71B
INBOUND-DOWNTOWNScheduled
47 min6:40 AM · Fri, Nov 27
75
INBOUND-SOUTH SIDE WORKSScheduled
55 min6:48 AM · Fri, Nov 27
P3
INBOUND-OAKLANDScheduled
56 min6:49 AM · Fri, Nov 27
71D
INBOUND-OAKLANDScheduled
7:00 AM7:00 AM · Fri, Nov 27
75
INBOUND-SOUTH SIDE WORKSScheduled
7:01 AM7:01 AM · Fri, Nov 27
Live data stale or unavailableRefreshes every 30 seconds

Routes at this boarding location

Other stops nearby

Nearby locations are based on coordinates; walking connections have not been verified.

✓
Published Port Authority of Allegheny County schedule

Imported Oct 30, 2026 · 09:54 UTC · Service dates 2026-10-18 through 2027-02-20. See data status

Schedule data published by Port Authority of Allegheny County. Feed discovery and cached source archives from MobilityData. Source details ↗