◎

Port Authority of Allegheny County / BOARDING STOP

Freeport Rd + Main Entrance (Waterworks)

Stop code 9329 · Port Authority of Allegheny County network

△ Gateway Escalator O/S

The escalator at Gateway is O/S. We apologize for the inconvenience.

△ Mt Lebanon Station Elevator O/S

The Mt Lebanon Station elevator is out of service.

Freeport Rd + Main Entrance (Waterworks)

Next departures

America/New_York
91
INBOUND-DOWNTOWNScheduled · estimated time
4:13 AM4:13 AM · Fri, Nov 27
91
INBOUND-DOWNTOWNScheduled · estimated time
4:53 AM4:53 AM · Fri, Nov 27
1
INBOUND-DOWNTOWNScheduled · estimated time
5:13 AM5:13 AM · Fri, Nov 27
75
INBOUND-SOUTH SIDE WORKSScheduled · estimated time
5:13 AM5:13 AM · Fri, Nov 27
91
INBOUND-DOWNTOWNScheduled · estimated time
5:33 AM5:33 AM · Fri, Nov 27
75
INBOUND-SOUTH SIDE WORKSScheduled · estimated time
5:40 AM5:40 AM · Fri, Nov 27
91
INBOUND-DOWNTOWNScheduled · estimated time
5:47 AM5:47 AM · Fri, Nov 27
1
INBOUND-DOWNTOWNScheduled · estimated time
5:48 AM5:48 AM · Fri, Nov 27
91
INBOUND-DOWNTOWNScheduled · estimated time
6:02 AM6:02 AM · Fri, Nov 27
75
INBOUND-SOUTH SIDE WORKSScheduled · estimated time
6:11 AM6:11 AM · Fri, Nov 27
91
INBOUND-DOWNTOWNScheduled · estimated time
6:16 AM6:16 AM · Fri, Nov 27
1
INBOUND-DOWNTOWNScheduled · estimated time
6:23 AM6:23 AM · Fri, Nov 27
Live data stale or unavailableRefreshes every 30 seconds

Routes at this boarding location

Other stops nearby

Nearby locations are based on coordinates; walking connections have not been verified.

✓
Published Port Authority of Allegheny County schedule

Imported Oct 30, 2026 · 09:54 UTC · Service dates 2026-10-18 through 2027-02-20. See data status

Schedule data published by Port Authority of Allegheny County. Feed discovery and cached source archives from MobilityData. Source details ↗