SHUTTLE

Washington / Bus

Washington Metropolitan Area Transit Authority (WMATA) SHUTTLE live tracking and departures

SHUTTLE · America/New_York

Selected branch: Greenbelt EXP · 2 stops.

SHUTTLE live vehicle tracking

Live data unavailable. Fresh vehicle positions only; 0 fresh vehicles matched to this route. The map shows vehicles assigned to the selected stopping pattern. Vehicles on other branches may be omitted.

Hyattsville Crossing, Green/Yellow Line Track 1 PlatformGreenbelt, Green/Yellow Line Center PlatformN ↑
Official route geometry · 0 fresh vehicles on selected branch

Positions refresh every 30 seconds. An absent marker does not establish a canceled trip. Predictions and vehicle positions can have different availability.

Next departures from Hyattsville Crossing, Green/Yellow Line Track 1 Platform

◷

No upcoming departures

Check the full timetable or choose another date or boarding stop.

Live data unavailable · Live predictions and published schedule fallbacks are labeled on each departure.

More Washington Metropolitan Area Transit Authority (WMATA) travel information

✓
Published Washington Metropolitan Area Transit Authority (WMATA) schedule

Imported Nov 11, 2026 · 10:07 UTC · Service dates 2026-11-10 through 2027-01-02. See data status

Schedule data published by Washington Metropolitan Area Transit Authority (WMATA). Feed discovery and cached source archives from MobilityData. Source details ↗