Boston / Bus
MBTA 4 stops, route map and branches
North Station - Design Center · America/New_York
Selected branch: North Station via South Station · 14 stops.
4 route map and ordered stop list
The map follows the selected branch. Choose another direction or short turn above to inspect its own stops.
N ↑
Official route geometry
Published directions and branches
Each stopping pattern has its own sequence. Occasional variants may have no trips on today’s date.
North Station via South Station14 stops · 18 trips in the published feed · Pattern dd7c55ba54e88a13d04d628d↗Design Center12 stops · 18 trips in the published feed · Pattern 2e76198b2c0d23c70b7cd39a↗North Station12 stops · 16 trips in the published feed · Pattern 6ee5dd622f9f8ee29905cb8e↗Design Center via South Station12 stops · 16 trips in the published feed · Pattern 19d833999d9f9f8541852e01↗
Additional stops on other branches
These stop records occur on another published variant of 4. Open a branch above for its ordered map and sequence.
350 Summer St 88801 ↗Atlantic Ave @ Central St 236 ↗Atlantic Ave @ Commercial Wharf 30235 ↗Causeway St @ Medford St 118 ↗Commercial St @ Battery St 233 ↗Commercial St @ Fleet St 234 ↗Congress St @ Franklin St 16551 ↗Congress St @ Haymarket Sta 117 ↗Congress St @ North St 191 ↗Congress St @ State St 190 ↗Congress St @ Sudbury St 30203 ↗Congress St opp North St 204 ↗Devonshire St @ Water St 65471 ↗Drydock Ave @ Design Center Place 31255 ↗Drydock Ave @ Harbor St 30256 ↗Northern Ave @ D St 243 ↗Northern Ave @ Harbor St 247 ↗Northern Ave @ Tide St 30249 ↗Northern Ave @ Tide St 31257 ↗Northern Ave opp Harbor St 31256 ↗Pearl St @ Congress St 11891 ↗Pearl St @ High St 12891 ↗Portland St @ Causeway St 113 ↗Purchase St @ Pearl St 2116 ↗Seaport Blvd @ Fan Pier Blvd 11599 ↗Seaport Blvd @ Pier 4 Blvd 214 ↗Seaport Blvd @ Sleeper St 21599 ↗Summer St @ Melcher St 888 ↗Summer St @ South Station - Red Line entrance 6564 ↗Summer St opp WTC Ave 889 ↗
More MBTA travel information
Published MBTA schedule
Imported Oct 23, 2026 · 19:06 UTC · Service dates 2026-10-14 through 2026-12-12. See data status
Schedule and realtime data provided by MassDOT / MBTA. Source details ↗