4

Boston / Bus

MBTA 4 first and last departure times

North Station - Design Center · America/New_York

Selected branch: North Station via South Station · 14 stops. Service day: Saturday, October 24, 2026.

First and last boarding times at every stop

Saturday, October 24, 2026 · North Station via South Station. These are scheduled times for this branch. Drop-off-only visits are excluded. A frequency window’s end is labeled separately and is not an exact last departure.

Boarding stopFirst departureLast departure / window endService notes
No boarding service for this branch and date.

Times after midnight belong to the service date above. These route limits do not establish the last viable connecting journey. Check connection times separately, or use a reviewed airport guide for a direct airport journey.

First and last times on other branches

All other published stopping patterns for the same service date. Open a branch to compare its stop-by-stop boarding limits.

Design Center · 12 stops · Pattern 2e76198b2c0d23c70b7cd39a

No boarding service on this branch for 2026-10-24.

North Station · 12 stops · Pattern 6ee5dd622f9f8ee29905cb8e

No boarding service on this branch for 2026-10-24.

Design Center via South Station · 12 stops · Pattern 19d833999d9f9f8541852e01

No boarding service on this branch for 2026-10-24.

More MBTA travel information

✓
From the official MBTA schedule

Imported Oct 23, 2026 · 19:06 UTC · Service dates 2026-10-14 through 2026-12-12. See data status

Schedule and realtime data provided by MassDOT / MBTA. Official source ↗