Boston / Bus
MBTA Blue Line Shuttle first and last departure times
Airport - Maverick · America/New_York
Selected branch: Maverick (Shuttle) · 2 stops. Service day: Saturday, October 24, 2026.
First and last published boarding times
Saturday, October 24, 2026 · Maverick (Shuttle). These are supplied times for this branch. Stops or trips with omitted times cannot establish complete first/last bounds. Drop-off-only visits are excluded. A frequency window’s end is labeled separately and is not an exact last departure.
| Boarding stop | First departure | Last departure / window end | Service notes |
|---|---|---|---|
| No boarding service for this branch and date. | |||
Times after midnight belong to the service date above. These route limits do not establish the last viable connecting journey. Check connection times separately, or use a reviewed airport guide for a direct airport journey.
First and last times on other branches
All other published stopping patterns for the same service date. Open a branch to compare its stop-by-stop boarding limits.
Airport (Shuttle) · 2 stops · Pattern 0fd8efd2d23293edb38fd46c
No boarding service on this branch for 2026-10-24.
More MBTA travel information
Imported Oct 23, 2026 · 19:06 UTC · Service dates 2026-10-14 through 2026-12-12. See data status
Schedule and realtime data provided by MassDOT / MBTA. Source details ↗